Natural Grass Pitch Construction

New or rebuilt grass pitches for football, rugby and cricket outfields, with proper rootzone, drainage and a seed mix chosen for wear and your soil.

Free Sports Pitch Construction quote

No obligation. We only use your details to reply about this job.

Natural Grass Pitch Construction — Sports Pitch Construction

What's involved

A natural grass pitch can be built on improved native soil or a sand-based rootzone, depending on how much play it must take. The contractor tests the soil for texture, compaction and drainage, then cultivates, grades with laser-guided equipment and installs a drainage system, usually 60 mm or 80 mm perforated pipes at 5 m to 10 m centres feeding a main carrier drain. On heavy clay, sand slits or gravel bands are added to move water from the surface down to the pipes. The surface is then finished, fertilised and sown with a hard-wearing ryegrass blend in spring or late summer. Expect the grass to need a full growing season before regular matches, so plan for 9 to 12 months from start to first game. Build an aftercare budget into the project, because new pitches need frequent mowing, feeding and top dressing in their first year.

How we handle it

  1. Feasibility and site survey

    A specialist visits, discusses the sports and usage you need, and checks levels, soil, access and services. A topographic survey and trial pits show how much earthwork and drainage the site will need and flag issues such as buried cables or poor ground.

  2. Design and specification

    The contractor produces a layout, drainage design and surface specification, including pitch size, run-offs, fencing and lighting. If you are applying for grant funding, this stage includes the drawings and cost plan funders usually ask for.

  3. Planning and approvals

    Most new artificial pitches, floodlights and tall fencing need planning permission. The contractor supplies drawings, drainage details and lighting information, and you or your agent submit the application. Allow eight to thirteen weeks for a decision.

  4. Construction

    The site is set up with a compound and haul route, then stripped, graded, drained and built up in layers. Surfacing, fencing and lighting follow. You receive progress updates and can inspect key stages such as the finished base levels.

  5. Testing, handover and aftercare

    The pitch is checked for levels and, where needed, independently performance tested. You receive maintenance guidance, warranty paperwork and, for artificial pitches, a schedule for brushing, infill top-ups and deep cleaning to protect the surface.

Price guide

Sports pitch prices depend mainly on size, surface type and how much groundwork the site needs. Drainage, earthworks and access often make up a large share of the cost, and floodlighting and fencing add significantly. The figures below are typical UK guide prices for 2026. Your quote will be based on a site survey and a written specification.

  • LED floodlighting for a small pitch or MUGA: £40,000–£90,000. Columns, luminaires, foundations and cabling; full-size pitches cost considerably more.
  • Drainage retrofit for an existing grass pitch: from £25,000. Lateral drains and sand slitting on a full-size pitch; smaller areas cost less.
  • Macadam MUGA (approx. 37 m x 18.5 m): £70,000–£140,000. Includes base, porous macadam, colour coating, line marking and weldmesh fencing.

Questions about natural grass pitch construction

How much does it cost to build a 3G pitch in the UK?

A full-size 3G football pitch typically costs £750,000 to £1.2 million in 2026, excluding floodlights. Small-sided pitches for schools and clubs usually cost £120,000 to £250,000. The biggest variables are ground conditions, site levels, fencing height and whether the pitch needs to meet a performance standard for competitive matches.

How long does sports pitch construction take?

A 3G or hockey pitch usually takes 10 to 16 weeks on site once planning permission is granted. A MUGA can be built in four to eight weeks. A natural grass pitch can be constructed in a few weeks but then needs a full growing season, often nine to twelve months, before it can take regular matches.

What is the difference between 3G and 4G pitches?

There is no formal 4G standard; the term is mostly marketing. 3G describes long-pile synthetic turf filled with sand and a rubber or alternative performance infill. Some suppliers call newer non-infill or low-infill systems 4G or 5G, but what matters is the tested performance of the system, not the generation label.